For Commissioners
Home
About IIBC
Commissioners
RDC members
FAQ
Codes and Regulations
Adopted Codes
Forms and Regulations
FAQ
Designated Agencies and Personnel
FAQ
Manufacturers
FAQ
Contact Us
Home
Forms and Regulations
Forms
Label Order Form (Revised Feb. 24, 2020)
Label Refund Form (Revised Feb. 24, 2020)
Lost Label Report
Damaged Label Report
Monthly Production Report
Manufacturer Registration Form (Revised Dec. 2020)
Existing Building Certification Report
Application for Inspector/Plans Examiner Certification
Reinstatement of Inspector/Plans Examiner Certification
Regulations
Uniform Administrative Procedures (UAP) and Model Rules and Regulations (MRR) adopted by the Commission.
Uniform Administrative Procedures
Uniform Administrative Procedures (July 2007 Edition)
Uniform Administrative Procedures (July 2018 Edition)
Model Rules & Regulations
Model Rules & Regulations (July 2007 Edition)
Interpretations & Clarifications
The Commission periodically issues Formal Interpretations, Formal Technical Opinions and Bulletins to promote uniformity and consistency.
FORMAL INTERPRETATIONS
FORMAL TECHNICAL OPINIONS
BULLETINS
FORMAL INTERPRETATIONS
FI 19-01 – Provisions affected by CA Program Waivers – Download PDF
FI 18-02 – Data Plates and Limits on Building Approvals (Certifications) – Download PDF
FI 18-01 – Technical Personnel Certificate Reinstatement – Download PDF
FI 16-04 – Auxiliary Attachment Labeling – Download PDF
FI 16-03 – Exterior Wall Panel Labeling and Inspection – Download PDF
FI 16-02 – Inspector-Trainee Test Requirements – Download PDF
FI 16-01 – Identifying Plans Examiners on Plans – Download PDF
FI 15-02 – CA Documents per Facility – Download PDF
FI 15-01 – Certifying Existing Buildings – Download PDF
FI 12-01 – Certification Label Control – Download PDF
FI 00-01 – U-Values on Data Plates- Download PDF
FI 98-02 – Shipping Modules without Labels – Download PDF
FI 97-02 – Reporting Unused Labels – Download PDF
FI 97-01 – Control of Working Drawings – Download PDF
FI 95-05 – Monthly Production Reports Stating “No Production“ – Download PDF
FI 95-04 – PE Seals on Compliance Assurance Documents – Download PDF
FI 95-03 Identification of Compliance Assurance Employees – Download PDF
FI 95-02 – Continuing Education Guidelines – Download PDF
FI 95-01 – Labeling Requirements for Two Modules on One Carrier – Download PDF
FI 94-01 – Size Limitation for Documents – Download PDF
FORMAL TECHNICAL OPINIONS
FTO 19-01 – Accreditation of Product Certification Agencies – Download PDF
FTO 15-01 – Structural Steel Acceptance – Download PDF
FTO 02-01 – Inspections by Production Department Personnel – Download PDF
FTO 98-02 – Firestopping of Openings – Download PDF
FTO 98-01 – Special Inspections – Download PDF
BULLETINS
B02.24.20 Summary of Actions (Jul. 2019) – Download PDF
B09.17.18 Summary of Actions (Jul. 2018) – Download PDF
B03.18.15 Master Approval Packages – Download PDF
B10.06.14 – ND Local Amendments and Waivers – Download PDF
B08.14.13SD – Limitations on Building Systems Documents – Download PDF
B09.23.09 – Summary of Actions (Jul. 09) – Download PDF
B08.01.03 – Data Plate Changes – Download PDF
B05.29.02 – Authorization to Release Labels – Download PDF
B11.17.98 – High-Voltage Testing – Download PDF
B08.05.97 – Certification of Prefabricated Steel Components – Download PDF
B07.01.96 – Monthly Production Report – First Location Information – Download PDF
B11.14.95S – Topics from Sep. 1995 Briefing Session – Download PDF
COMMISSION
Main Office
505 Huntmar Park Drive, Ste. 210, Herndon, VA 20170
(703) 481-2022
PARTICIPATING STATE
New Jersey
Department of Community Affairs
Division of Codes & Standards
Website
PARTICIPATING STATE
North Dakota
Department of Commerce
Division of Community Services
Website
PARTICIPATING STATE
Minnesota
Department of Labor & Industry
Construction Codes and Licensing Division
Website